Risk Assessment Template for Substructure waterproof Work.
WRITTEN SAFE WORK PROCEDURE.
1. Objectives.
To prevent injuries to employees and / or property damage incidents.
2. Procedure.
1. Do pre-use inspection of all equipment to be used and replace or repair faulty items.
2. Use trained competent employees only.
3. Use appropriate Personal Protective Equipment i.e.:
Hardhat.
. Safety boots.
Overalls.
Ear Protection.
Masks
Safety Glasses
Hand gloves
WORK INVOLVING IN THE ACTIVITY.
- Appropriate PPE must be worn by all workers on site & special PPE should be provided for those who are directly involved in this activity.
- Site Induction and toolbox talks should be given prior to start job.
- Equipment to be used should be inspected and must be safe for use.
- Materials be properly secured while being transported and during offloading.
- Employees shall be educated in keeping out of possible crush of wall or collapse of the excavation.
- All the underground utility services must be protected and secure.
- Permit to work system should be followed by all supervisors and engineers.
- Daily, weekly, and monthly inspection to be done regularly any defect found must be reported immediately.
- Physical barricade to installed and maintained with entry and exit points.
- Only personnel involve in the activities are allowed inside the barricaded area.
- Enforce the use of competent persons only.
- All hand and power tools must be inspected before use
- All hand and power tools must be safe for use
- All type of power tools must be colour coded and tagged as safe for use also must be entered in register.
- Permit to work system should be in place.
- PPE should be worn by all operators as per the job nature.
- Maintain work area isolated with means of barricade and appropriate signage should be in place.
- Remind personnel through toolbox talk to observe proper positioning when working
- All the work should be done under the competent supervision.