Risk Assessment Template for Blinding Concrete.
WRITTEN SAFE WORK PROCEDURE.
1. OBJECTIVE.
2. PROCEDURE.
1. Do pre-use inspection of all equipment to be used
and replace or repair faulty items.
2. Use trained competent employees only.
3. Use appropriate Personal Protective Equipment i.e.:
3.1. Hardhat.
3.2.
Safety boots.
3.3.
Overalls.
3.4.
Ear Protection.
3.5.
Masks
3.6.
Safety Glasses
3.7.
Hand gloves
WORK INVOLVING IN THE ACTIVITY.
2.1. Appropriate
PPE must be worn by all workers on site & special PPE should be provided
for those who are directly involved in this activity.
2.2. Site
Induction and toolbox talks should be given prior to start job.
2.1. Equipment
to be used should be inspected and must be safe for use.
2.2. Materials
be properly secured while being transported and during offloading.
2.3. Employees
shall be educated in keeping out of possible crush of wall or collapse of the
excavation.
2.4. All the
underground utility services must be protected and secure.
2.5. Permit to
work system should be followed by all supervisors and engineers.
2.6. Daily, weekly,
and monthly inspection to be done regularly any defect found must be reported
immediately.
2.7. Physical
barricade to installed and maintained with entry and exit points.
2.8. Only
personnel involve in the activities are allowed inside the barricaded area.
2.9. Enforce
the use of competent persons only.
2.10. All hand
and power tools must be inspected before use
2.11. All hand
and power tools must be safe for use
2.12. All type
of power tools must be colour coded and tagged as safe for use also must be
entered in register.
2.13. Permit to
work system should be in place.
2.14. PPE
should be worn by all operators as per the job nature.
2.15. Maintain
work area isolated with means of barricade and appropriate signage should be in
place.
2.16. Remind
personnel through toolbox talk to observe proper positioning when working
2.17. All the
work should be done under the competent supervision.