CHECKLIST TEMPLATE FOR WATERPROOFING APPLICATION
Loading ... Civil Engineers Blog

top page

Latest News

top post page

Home CHECKLIST TEMPLATE FOR WATERPROOFING APPLICATION

CHECKLIST TEMPLATE FOR WATERPROOFING APPLICATION

Font size

 





CHECKLIST TEMPLATE FOR WATERPROOFING APPLICATION


Checklist help inspector to identify the items and steps to be checked during inspection request. Checklist not have standard format we can use any format but it should include all processes steps and documents which should be checked during inspection.

In this article, we will show checklist for waterproof work.

CHECKLIST FOR WATERPROOFING APPLICATION

Work Item

yes

No

N/A

Date

1.0 PRECONSTRUCTION ACTIVITIES

 

 

 

 

1.1 Shop drawings approved by Main Contractor / Consultant

 

 

 

 

1.2 Method statement approved by Main Contractor / Consultant

 

 

 

 

1.3 Material submittal approved by Main Contractor / Consultant

 

 

 

 

1.4 MIR accepted by Main Contractor / Consultant

 

 

 

 

2.0 SURFACE PREPARATION

 

 

 

 

2.1 Ensure the surface is smooth and free from any cracks, protrusions & undulations

 

 

 

 

2.2 Ensure all the corners are provided by angle fillet and sharp edges to be chamfered

 

 

 

 

2.3 Ensure clearance obtained from MEP

 

 

 

 

 

2.4 Ensure the area is barricaded before proceeding the work

 

 

 

 

3.0 APPLICATION OF PRIMER

 

 

 

 

3.1 Ensure the surface is dry before application

 

 

 

 

 

3.2 Ensure whether primer is applied uniformly

 

 

 

 

3.3 Ensure the area is barricaded before applying primer

 

 

 

 

4.0 APPLICATION OF SBS BLACK MEMBRANE

 

 

 

 

4.1 Ensure Membrane is stocked in upright at workplace

 

 

 

 

4.2 Ensure proper pipe penetration work is carried

 

 

 

 

4.3 Ensure the End / Side lapping’s are completely sealed

 

 

 

 

4.4 Ensure the Lapping is staggered

 

 

 

 

4.5 Ensure the area is barricaded while executing the work

 

 

 

 

4.6 Ensure the membrane is properly tucked into the grooves

 

 

 

 

5.0 APPLICATION OF   PROTECTION BOARD & BITUMEN SEALANT

 

 

 

 

5.1 Ensure the membrane is not got damaged

 

 

 

 

 

52 Ensure there is proper continuous butt joint between the boards

 

 

 

 

5.3 Ensure all the membrane is fully covered by the board

 

 

 

 

5.4 Ensure the sealant is applied properly over the groove

 

 

 

 

 

 

 

 

 


See Method Statement Template for Waterproofing here.