CHECKLIST TEMPLATE FOR WATERPROOFING APPLICATION
CHECKLIST FOR WATERPROOFING APPLICATION |
||||
Work Item |
yes |
No |
N/A |
Date |
1.0 PRECONSTRUCTION ACTIVITIES |
|
|
|
|
1.1 Shop drawings approved by
Main Contractor / Consultant |
|
|
|
|
1.2 Method statement approved
by Main Contractor / Consultant |
|
|
|
|
1.3 Material submittal approved
by Main Contractor / Consultant |
|
|
|
|
1.4 MIR accepted by Main
Contractor / Consultant |
|
|
|
|
2.0 SURFACE PREPARATION |
|
|
|
|
2.1 Ensure the surface is
smooth and free from any cracks, protrusions & undulations |
|
|
|
|
2.2 Ensure all the corners are
provided by angle fillet and sharp edges to be chamfered |
|
|
|
|
2.3 Ensure clearance obtained from MEP |
|
|
|
|
2.4 Ensure the area is
barricaded before proceeding the work |
|
|
|
|
3.0 APPLICATION OF PRIMER |
|
|
|
|
3.1 Ensure the surface is dry before application |
|
|
|
|
3.2 Ensure whether primer is
applied uniformly |
|
|
|
|
3.3 Ensure the area is
barricaded before applying primer |
|
|
|
|
4.0 APPLICATION OF SBS BLACK MEMBRANE |
|
|
|
|
4.1 Ensure Membrane is stocked
in upright at workplace |
|
|
|
|
4.2 Ensure proper pipe
penetration work is carried |
|
|
|
|
4.3 Ensure the End / Side
lapping’s are completely sealed |
|
|
|
|
4.4 Ensure the Lapping is
staggered |
|
|
|
|
4.5 Ensure the area is
barricaded while executing the work |
|
|
|
|
4.6 Ensure the membrane is properly
tucked into the grooves |
|
|
|
|
5.0 APPLICATION OF PROTECTION
BOARD & BITUMEN SEALANT |
|
|
|
|
5.1 Ensure the membrane is not got damaged |
|
|
|
|
52 Ensure there is proper continuous
butt joint between the boards |
|
|
|
|
5.3 Ensure all the membrane is fully
covered by the board |
|
|
|
|
5.4 Ensure the sealant is
applied properly over the groove |
|
|
|
|
|
|
|
|
|