Form-work system- Golf Scaffolding System- part 2

Font size




Form-work system- Golf Scaffolding System- part 2

 In the previous articles (Form-work system-Golf Scaffolding System) we took the below from Golf scaffolding system:


  •               PS system/GC system/Cup-lock.
  •             Shorelok/Ring Lock system.
  •             SPF-50 system.
  •             Aluminum system / Perfect Aluminum Panels.
  •             Eco-form system.
  •             Table system.


            In this article we will take: 

  •             Soldier system
  •             waling system
  •             Supporting Frame System
  •             Special Form work System 
  •             Access Scaffolding System
  •             Climbing Bracket
  •             Circular Form work System



Soldier System: 



  • The steel soldier form-work is designed to be applied to a wide range of construction applications and to withstand high fresh concrete pressure.  
  • The chief component for the steel soldier system is the steel beam, which is produced in various sizes of up to 360 cm. With its unrivaled strength-to-weight ratio.
  • Versatility and range of accessories any forming application can be handled safely and easily.  
  • The steel soldiers are renowned for versatility and exceptional heavy-duty shoring capacity, the steel soldier are ideal for large slabs, bridge decks, tunnel forms and beams.
  • In addition, the system provides an adaptable and economic form work system which can be used in a range of wall forming and slab support applications.
  • The system combines high performance with simple, rapid assembly great versatility and major cost advantages. 
  • The steel soldier system provides maximum benefits when used with heavy duty ties and aluminum waling.  
  • Timber waling can also be used as another option at optimum spacing.      


Waling System:  

  • The Waling form-work is one of the most adaptable form-work systems                           available. This form-work system combines H 20 timber beams with steel        waling so perfectly.
  • It adapts to all heights and widths, accommodates every pressure, and    meets all construction demands.  
  • The basis of the Waling is the H 20 timber beam. It is produced in                      production plant with  European standards.  
  • The H 20 beam is sturdy, easy to handle and offers a high load-bearing            capacity at large distances of waling.  
  •  The steel waling, clamped onto the H 20 timber beam, allow the form-work           elements to be assembled quickly and simply. 
  •   The assembly is done as easily as the disassembly. 
  • The Waling can be used for all vertical form-work applications, walls, columns and retaining walls form- work.  


Supporting Frame System: 




  • The Supporting Frame is simply ideal for Single- Sided form-work applications. 
  • Regardless of whether single sided forming is to be used against existing building rows of bored piles, the concrete pressure and lifting forces must be discharged reliably into the ground. 
  • The Supporting Frame provides a safe and economical solution for these tasks.  



Special Form-work System: 




  • Perfect Steel designs and produces the form-work equipment, scaffolding and other accessories required for the construction of bridges, culverts, and tunnels. 
  • The company offers innovative form-work solutions using its experience in activities in this industry for over a quarter of a century.   



Access Scaffolding System: 



  • One of the key strengths of the heavy-duty access scaffold system is the simplicity of the component range, as well as the basic horizontals and verticals that form the core of all structures.  



Climbing Bracket: 





  • The PS 200 climbing Bracket is widely used in the concrete pouring of pier, high-rise building, and varying structure.  
  • The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed.  
  • The construction is easy, rapid, and economical, and the surface of the concrete is slick. 
  • The biggest advantage of PS 200 Climbing Bracket is safety and convenience in use.  



Circular Form-work System: 





  • Circular column form-work provides contractors with safe, versatile, and economic circular steel forms. 
  • The key-bolt simply turns two identical steel half-shell structures into a perfect round structural form. 